JK Strategist Logo
Concept and Meaning of the Logo
Log In

The 3-Phase High Availability & Uptime Management Process

A robust methodology to ensure Uptime (with the capability to reach 99.99%)

1

Phase 1: Risk Analysis & Architecture Design

Objective: Define strict RTO/RPO requirements and design architecture without Single Point of Failure (SPOF).

Key Execution Steps:

  • Criticality Assessment (RTO/RPO) for OT systems
  • Single Point of Failure (SPOF) Audit
  • Redundancy & High Availability (HA) Design (Active-Active, N+1)
2

Phase 2: Implementation & Hardening

Objective: Deploy HA solutions and establish maintenance processes to minimize Unscheduled Downtime.

Key Execution Steps:

  • Implement High Availability Clusters (Server Failover)
  • Implement Resilient Network Fabric (Dual Homing, Redundant Protocols)
  • Proactive Monitoring & AIOps (Predict and resolve issues before Incidents occur)
  • Zero-Downtime Patching & Change Management
3

Phase 3: Validation & Continuous Improvement

Objective: Verify Uptime through testing and improve processes to prevent recurring Incidents.

Key Execution Steps:

  • Disaster Recovery Testing (Annual DR/BCP Simulation)
  • Uptime Tracking & SLA Reporting (Target 99.99%)
  • Root Cause Analysis (RCA) and Permanent Fix Implementation

The Outcome: Sustained Uptime

This rigorous process ensures business continuity, proving that high availability is a result of strategic planning, dedicated redundancy architecture, and disciplined validation, meeting the demanding 99.99% SLA for mission-critical systems.