The Operational Resilience Program aims to eliminate Single Points of Failure (SPOF) and implement High Availability (HA) across critical systems. By ensuring 99.99% uptime for ERP and Factory Operations, this initiative safeguards business continuity and minimizes unscheduled downtime.
Resilience Pillar: Drive the achievement of 99.99% sustained Uptime for core ERP and Factory Operations.
Eliminate Single Points of Failure (SPOF) and Deploy High Availability (HA) Solutions to minimize Unscheduled Downtime.
| Phase | Duration | Focus Area | Key Execution Steps |
|---|---|---|---|
| Phase 1: Risk Analysis & Architecture Design | Month 1–2 | Planning & Blueprint |
|
| Phase 2: Implementation & Hardening | Month 3–5 | Execution & Deployment |
|
| Phase 3: Validation & Continuous Improvement | Month 6–8 | Verification & Governance |
|
DR/BCP Simulation fails to meet RTO/RPO.
Establish mandatory quarterly DR Rehearsals; Integrate RCA to find root cause of simulation failure and implement Permanent Fix.
HA setup introduces new configuration errors or latency.
Use Infrastructure as Code (IaC) (from Automation Repository) to ensure HA deployment is standardized and reproducible.
Patching causes an Unscheduled Downtime.
Every change must go through a Change Management Policy with Zero-Downtime steps only and be approved by the Change Approval Board (CAB).